“System” is not really interchangeable with “software” or “technologies”—it’s not some thing you buy from the shelf and set up. A CPSR needs an evaluation from the contractor’s purchasing system. Unless segregation of subcontracts is impracticable, this analysis shall not include things like subcontracts awarded via the contractor solely in https://johnathantndrc.affiliatblogger.com/85791235/not-known-factual-statements-about-cpsr